PRV 5 Relocation

Design project for Black Mountain Irrigation District

PRV 5 Relocation project photo

Client

Black Mountain Irrigation District

Project Overview

Relocation of the existing PRV 5 within the BMID system. The existing PRV station was comprised of an underground chamber reaching the end of its service life. A new above ground insulated kiosk was installed to house a 150mm PRV with a 50mm by-pass PRV. The new kiosk is equipped with an electrical cabinet and doors on both sides to allow easy access to all the PRV station components.

Back to Projects